A bucket of water weighing 10 kg was raised from a well 5 meters deep. Calculate the perfect work?
March 24, 2021 | education
| As we know from the school curriculum in physics, the work that was done when lifting any load in general form can be calculated using the following formula:
A = F * h = m * g * h, where m is the mass of the load being lifted.
Let’s determine what value the work will be equal to, what was done while lifting a bucket of water weighing 10 kilograms, if from the condition of our problem we know for sure that the depth of the well is 5 meters:
10 * 10 * 5 = 500.
Answer: Perfect work is 500 J (D).
One of the components of a person's success in our time is receiving modern high-quality education, mastering the knowledge, skills and abilities necessary for life in society. A person today needs to study almost all his life, mastering everything new and new, acquiring the necessary professional qualities.