An excavator can dig a ditch 20 m long in 1 hour. One ditch was dug in 10 hours, and the other in 20 hours.

An excavator can dig a ditch 20 m long in 1 hour. One ditch was dug in 10 hours, and the other in 20 hours. How long was the ditch dug during this time?

In the initial data for this assignment, it is reported that within one hour the excavator can dig a ditch with a length equal to two tens of meters.
Since in ten hours of work an excavator can dig a ditch ten times longer than in one hour, then the length of a ditch dug in ten hours of work is 20 * 10 = 200 m.
Since in two dozen hours of operation an excavator can dig a ditch 20 times longer than in one hour, the length of a ditch dug in two dozen hours of work is 20 * 20 = 400 m.
Consequently, during this time a ditch 200 + 400 = 600 m long was dug.
Answer: 600 m.



One of the components of a person's success in our time is receiving modern high-quality education, mastering the knowledge, skills and abilities necessary for life in society. A person today needs to study almost all his life, mastering everything new and new, acquiring the necessary professional qualities.