The belt conveyor moves at a speed of 18 m / s, during which time the load will move 27 m.

Task data: V (speed of the belt conveyor) = 18 m / s; S (required movement of the load on the conveyor) = 27 m.

The duration of the movement of the load on the belt conveyor is determined by the formula: t = S / t.

Let’s perform the calculation: t = 27/18 = 1.5 s.

Answer: The load will move in 1.5 seconds (the speed of 18 m / s is too high for the conveyor, in the case of the movement speed V = 18 cm / s, the duration of the movement of the load will be equal to 150 s).



One of the components of a person's success in our time is receiving modern high-quality education, mastering the knowledge, skills and abilities necessary for life in society. A person today needs to study almost all his life, mastering everything new and new, acquiring the necessary professional qualities.