What work was done when lifting a load weighing 0.5 kg to a height of 4 m?

To find the amount of work done when lifting the specified load, you must use the formula: A = Ft * S = mg * g * h.

Data: mg – weight of the specified cargo (mg = 0.5 kg); g – acceleration due to gravity (g ≈ 10 m / s2); h – change in the height of the load, path (h = 4 m).

Calculation: A = mg * g * h = 0.5 * 10 * 4 = 20 J.

Answer: B. The work expended when lifting the specified load is 20 J.



One of the components of a person's success in our time is receiving modern high-quality education, mastering the knowledge, skills and abilities necessary for life in society. A person today needs to study almost all his life, mastering everything new and new, acquiring the necessary professional qualities.