With the help of a crane, a load weighing 23 kN was lifted to a height of 80 cm. Determine the work performed.

Data: P (weight of the load lifted by the crane) = 23 kN = 23 * 10 ^ 3 N; h (lifting height) = 80 cm = 0.8 m.

The work performed by the indicated crane: A = Ft * S = P * h = 23 * 10 ^ 3 * 0.8 = 18.4 * 10 ^ 3 J.

Answer: The work performed is 18.4 kJ.



One of the components of a person's success in our time is receiving modern high-quality education, mastering the knowledge, skills and abilities necessary for life in society. A person today needs to study almost all his life, mastering everything new and new, acquiring the necessary professional qualities.