With the help of a winch, a load weighing 1 ton is lifted to a height of 5 meters. Calculate the robot that needs to be made
With the help of a winch, a load weighing 1 ton is lifted to a height of 5 meters. Calculate the robot that needs to be made for this lift if the efficiency of the winch is 75%. How long will one person have to spend on this lift if he develops a power of 0.2 hp?
m = 1 t = 1000 kg.
g = 10 m / s2.
h = 5 m.
Efficiency = 75%.
Nc = 0.2 hp = 147 W.
Az -?
t -?
Efficiency = Ap * 100% / Az.
Az = Ap * 100% / efficiency.
Useful work when lifting a load Ap is expressed by the formula: Ap = m * g * h.
Az = m * g * h * 100% / efficiency.
Az = 1000 kg * 10 m / s2 * 5 m * 100% / 75% = 66666.6 J.
Power Nz is the speed of performing mechanical work: Nz = Az / t.
t = Az / Nz.
t = 66666.6 J / 147 W = 453.5 s.
Answer: the work expended by a person is Az = 66666.6 J, the time for lifting the load is t = 453.5 s.